A typical perc test consists of two or more holes dug about 30 to 40 feet apart in the proposed drain field area (see illustration). The holes are typically 6 to 12 inches in diameter and 2 to 3 feet deep, the typical depth of the absorption trenches in a leach field.
What is required for a perc test?
A typical perc test consists of two or more holes dug about 30 to 40 feet apart in the proposed drain field area (see illustration). The holes are typically 6 to 12 inches in diameter and 2 to 3 feet deep, the typical depth of the absorption trenches in a leach field.
What can you do with land that doesn't perk?
OPTIONS IF SITE FAILS Even if your site fails a perc or deep-hole test, all is not lost. For sites with high water tables, you may be able to “de-water” the leaching area by strategically placing gravel-filled trenches and subsurface drain pipe to conduct water away from the drain field.