A typical perc test consists of two or more holes dug about 30 to 40 feet apart in the proposed drain field area (see illustration). The holes are typically 6 to 12 inches in diameter and 2 to 3 feet deep, the typical depth of the absorption trenches in a leach field.

What is required for a perc test?

A typical perc test consists of two or more holes dug about 30 to 40 feet apart in the proposed drain field area (see illustration). The holes are typically 6 to 12 inches in diameter and 2 to 3 feet deep, the typical depth of the absorption trenches in a leach field.

What can you do with land that doesn't perk?

OPTIONS IF SITE FAILS Even if your site fails a perc or deep-hole test, all is not lost. For sites with high water tables, you may be able to “de-water” the leaching area by strategically placing gravel-filled trenches and subsurface drain pipe to conduct water away from the drain field.

James H. Sterling
Author

James H. Sterling

James Sterling reports on renewable energy developments, climate policy, ecological conservation, and green tech innovations around the globe.