When Should Hay Be Tedded?

When Should Hay Be Tedded?

Initial tedding should be performed after a brief wilting period following a morning cutting while the hay is still moist (two to four hours). In very damp conditions, tedding may need to be done immediately after cutting. A second pass is usually done the next day, and the hay is raked and baled that afternoon.

Are hay Tedders necessary?

Tedders are intended to be used on crops while they are still higher in moisture and pliable. A crop that is overly dry should not be tedded due to loss of leaf material. ... So, for most farmers, a tedder is a needed implement.

How long should hay dry before baling?

As a rule of thumb, wait to rake hay until after the dew has dried and the sun nears its peak, around 11 a.m. If possible, let the raked hay sit for an hour or two before baling to allow more drying time.

David Miller
Author

David Miller

David Miller brings 15 years of experience in global economics, personal finance strategy, and market dynamics. He specializes in turning complex economic trends into actionable insights for everyday readers.