Commissioning activities in the broader sense are applicable to all phases of the project from the basic and detailed design, procurement, construction and assembly until the final handover of the unit to the owner, sometimes including an assisted operation phase.
What is done during commissioning?
The transition from construction to operation is the commissioning and startup. Processing plant commissioning embraces activities such as cleaning, flushing, verifications, leak tests, performance evaluation and functional tests essential for bringing a newly installed plant or facility into routine operation.
What is the commissioning stage?
Commissioning Stages
There are eight stages of the commissioning process, which include; preparation, design, pre-construction, construction, commissioning of services, pre-handover, initial occupation, post-occupancy care.